Guide to the Martin Sedlazek NASA Collection, 1953-1999

Martin Sedlazek NASA C0293


Published by George Mason University Libraries

Contact Information:

Fenwick Library (2FL)

George Mason University

Fairfax, Virginia 22030-4444

USA

Phone: (703) 993-2220

Fax: (703) 993-8911

Email: speccoll@gmu.edu

URL: http://sca.gmu.edu

Descriptive Summary

Repository George Mason University. Libraries. Special Collections Research Center
Creator National Aeronautics and Space Administration.
Creator Sedlazek, Martin
Title Martin Sedlazek NASA collection
Date 1953-1999
Physical Characteristics 6.0 linear feet (20 boxes)
Abstract The Martin Sedlazek NASA Collection includes educational and informational reports, white papers, memos, and press information from Martin Sedlazek's career in the National Aeronautics and Space Administration (NASA), including information on Saturn V, Apollo missions, and the Space Station.
Collection Number C0293
Language English

Biographical Information

Martin F. Sedlazek held a 30-year tenure with the National Aeronautical and Space Administration (NASA) in both technical and administrative management positions that spanned the organization - from Headquarters in program policy-type positions (12 years) to the Field Center in hardware project management assignments (18 years). These included association with both manned and unmanned programs, such as Apollo and the Space Station, as well as the Delta Launch Vehicle and the PAM Project (a commercially developed upper stage used with the NASA shuttle and expendable launch vehicles to place satellites into geosynchronous orbit), respectively.

Coming to NASA with an electrical engineering background, Sedlazek contributed to many projects and efforts throughout his career there, and held responsibilities such as user integration, managing technical oversight of the PAM Project, managing of the resource elements of the Delta Launch Vehicle, and technical program control experience with the Apollo program. He also acted as Director of Resources Management in the Office of Applications for 6 years, and was responsible for R&D budget planning and execution, including OMB and Congressional budget process implementation, policy development, and administrative and personnel management. During this time as Director of Resources Management he also implemented a budget control system that made more effective use of under-utilized research funds.

Return to the Table of Contents

Scope and Content

The Martin Sedlazek NASA Collection includes materials spanning from Sedlazek's 30-year career in the National Aeronautics and Space Administration (NASA). The collection consists of educational and informational reports, pamphlets, and booklets, white papers, memos, press information, photographs, and other documents. Most of the focus of the collections centers on materials pertaining to the Space Shuttle, the Space Station, Skylab, Saturn V, the Flight Telerobotic Servicer, and other documents such as briefings, letters, inter-administration and inter-department memoranda and reports, information on astronauts, international agreements, as well as plans and chronologies of NASA. The bulk of the collection originates from the mid 1960s through the 1970s.

Return to the Table of Contents

Arrangement

This collection was arranged in the original order it was received by the donor, with the exception of numbered materials arranged in numerical order when necessary.

Return to the Table of Contents

Restrictions

Access Restrictions

There are no access restrictions.

Use Restrictions

There are no restrictions on personal use. Permission to publish material from the Martin Sedlazek NASA Collection must be obtained from Special Collections and Archives, George Mason University Libraries.

Return to the Table of Contents

Index Terms

Corporate Names:

National Aeronautics and Space Administration.

Subjects:

Project Apollo (U.S.)
Saturn V (Satellite)
Skylab Program
Space Station Program (U.S.)

Return to the Table of Contents

Administrative Information

Preferred Citation

Martin Sedlazek NASA Collection, C0293, Special Collections Research Center, George Mason University Libraries.

Acquisition Information

Donated by Martin Sedlazek on October 24, 2016.

Processing Information

Processing completed by Amanda Brent in 2016. EAD markup completed by Amanda Brent in 2016.

Return to the Table of Contents

Contents List

Box Folder
1 1 Final Report of the Space Shuttle Payload Planning Working Groups - Space Technology, May 1973
2 Final Report of the Space Shuttle Payload Planning Working Groups - Communications and Navigation, May 1973
3 Final Report of the Space Shuttle Payload Planning Working Groups - Earth Observations, May 1973
4 Final Report of the Space Shuttle Payload Planning Working Groups - Earth and Ocean Physics, May 1973
5 Final Report of the Space Shuttle Payload Planning Working Groups - Materials Processing and Space Manufacturing, May 1973
6 Final Report of the Space Shuttle Payload Planning Working Groups - Executive Summaries, May 1973
7 Final Report of the Space Shuttle Payload Planning Working Groups - High Energy Astrophysics, May 1973
8 Putting Space to Work - Annual Report of the NASA Office of Applications, 1976
9 Putting Space to Work - Annual Report of the NASA Office of Applications, 1976
10 Comet Kohoutek - A Teacher's Guide with Student Activities by Robert D. Chapman, Ph. D., September 1973
11 NASA Space Station - GSFC Management Review by Ronald K. Browning, June 9, 1986
12 Space Station - Presentation to the President's National Commission On Space by Philip E. Culbertson - Associate Administrator Office of Space Station, May 15, 1985
13 Practical Applications of a Space Station, 1984
14 Civilian Space Stations and the U.S. Future in Space, 1984
15 Economic Analysis of the Space Shuttle System by Klaus P. Heiss and Oskar Morgenstern, January 3, 1972
Box Folder
2 1 Design Guidelines for Robotic Serviceable Instruments - Preliminary Guidelines Document, August 1989
2 Goddard's Management Plan For Space Station Freedom - Review Copy, February 1989
3 Space Shuttle Pamphlet, circa 1970
4 U.S. Manned Space Flight - The Manned Flight Program - The Astronauts, 1970
5 Manned Space Flight Pamphlet, October 1970
6 On the Moon with Apollo 15 - A Guidebook to Hadley Rille and the Apennine Mountains by Gene Simmons, June 1971
7 Planetary Program Review, July 11, 1969
8 Exploration of the Solar System, 1973
9 New Horizons, circa 1970
10 Skylab Program - Technical Summary Handbook, February 1971
11 Final Report of the Space Shuttle Payload Planning Working Groups - Astronomy, May 1973
12 Final Report of the Space Shuttle Payload Planning Working Groups - Atmospheric and Space Physics, May 1973
13 Final Report of the Space Shuttle Payload Planning Working Groups - Solar Physics, May 1973
14 Final Report of the Space Shuttle Payload Planning Working Groups - Life Sciences, May 1973
15 Space Shuttle EVA (Extravehicular Activity) Opportunities, circa 1960
16 United States Activities in Spacecraft Oceanography, October 1, 1967
17 Skylab, Outpost on the Frontier of Space by Thomas Y. Canby , October 1974
Box Folder
3 1 The NASA Program - A Forecast of the 70's, March 1, 1971
2 U.S. Manned Space Flight - The Manned Flight Program - The Astronauts, circa 1970
3 Skylab Pamphlet/Poster, June 1, 1970
4 Apollo Mission Briefs - Revision 12, January 1971
5 Ecological Surveys From Space, 1970
6 Space - A Resource for Earth - An AIAA (American Institute of Aeronautics and Astronautics), April 1977
7 Aviation Week and Space Technology Magazine, October 17, 1977
8 IEEE (The Institute of Electrical and Electronics Engineers) Spectrum Magazine, October 1976
9 Spacelab Users Guide, November 1976
10 Apollo 14 - Preliminary Science Report, 1971
11 Space Shuttle - Program Requirements Document - Level 1, April 21, 1972
12 Saturn Program - Schedules and Status Summary, March 2, 1972
13 Advanced Study/New Start Planning - Briefing to Dr. Naugle, November 16, 1977
14 National Aeronautics and Space Administration - Chronological History, 1959 - 1976
15 Pre-Mars Orbit Insertion and Landing - Mission Operation Report, June 9, 1976
16 Master Data Processor Pamphlet, 1977
17 TRW telecommunications - Satellites Pamphlet, 1977
18 Astronautics and Aeronautics Magazine, April 1971
19 For the Benefit of All Mankind Informational Report with Letter From Donald V. Beall Attached, circa 1970
Box Folder
4 1 Satellite Pamphlets and Business Card of Draper Hill, Editorial Cartoonist, circa 1970
2 Director's Program Review - Materials Research,, March 17, 1975
3 Skylab and the Sun, July 1973
4 Communications Satellites - Fairchild Industries, circa 1969
5 Apollo 17 Pamphlet, circa 1973
6 NASA Activities Pamphlet - 15th Anniversary, 1958-1973
7 NASA Pocket Statistics - History (Published Semi-Annually), July 1971
8 Earth Observatory Satellite - System Definition Study - Executive Summary, November 1974
9 World Weather Program - Plan for Fiscal Year, 1977
10 NASA Facts - Space Shuttle Fold Out Informational Poster, 1972
11 Skylab Experiments - Volume 5 - Astronomy and Space Physics, November 27, 1973
12 Photography From Space to Help Solve Problems on Earth, circa 1972
13 Dirigibles: Naval Vehicles for Tomorrow, June 1973
14 Skylab Experiments - Volume 7 - Living and Working in Space, November 27, 1973
15 Skylab Experiments - Volume 6 - Mechanics, November 27, 1973
16 America In Space - The First Decade - Man in Space by David A. Anderton, October 1, 1968
17 Aviation Week and Space Technology Magazine, July 2, 1962
18 The Post-Apollo Space Program Directions for the Future, September 1969
19 America's Next Decade in Space - A Report for the Space Task Group, September 1969
20 The Next Decade in Space, March 1970
21 The Space Applications Program Appendices, 1974
22 Earth and Ocean Physics Applications Program - Volume I Executive Summary, September 1972
Box Folder
5 1 Earth and Ocean Physics Applications Program - Volume II Rationale and Program Plans, September 1972
2 Nimbus - The Growth Satellite Informational Report, circa 1972
3 Apollo Lunar Exploration by G.M. Low and L.R. Scherer, circa 1969
4 United States Activities in Spacecraft Oceanography, October 1, 1967
5 Space Station: Key to the Future, circa 1969
6 America in Space - The First Decade - Aeronautics by David A. Anderton, 1970
7 NASA Photograph of Astronaut Alan B. Shepard Jr., Commander of Apollo 14 Mission, February 15, 1971
8 NASA Photograph - Gemini VI Space Photography by Astronauts Schirra and Stafford - Clouds over Southeast Indian Ocean, December 16, 1969
9 NASA Photograph - Gemini XI Space Photography by Astronauts Conrad and Gordan -Ethiopia, Somali, French Somaliland, Saudi Arabia, Yemen, South Arabia, Red Sea, Gulf of Aden, September 12-15, 1966
10 Apollo 7 Space Photography - Persian Gulf Coastal Area of Iran, Qushm Island, November 2, 1968
11 NASA Facts - Observing Earth from Skylab, circa 1974
12 NASA Facts - Why Survey from Space?, circa 1974
13 NASA Facts - The Spectrum - There's More Than Meets the Eye - Informational Pamphlet/Poster, 1975
14 Comparisons - First Wright Flight and Apollo II - Saturn 5 Flight, circa 1969
15 Statement of Donald P. Hearth - Planetary Programs - The Results of Mariners 6 and 7 and Their Implications - Includes Photos of Mariner VII, circa 1969
16 NASA - Group of Photographs of Mariner 6, circa 1969
17 Space Station: Key to the Future, circa 1969
18 Titan III - Building Blocks to Space, 1970
19 Speech by George M. Low, Acting NASA Administrator, November 19, 1970
20 Our Future in Space: A Challenge in Leadership - Luncheon Speech by George M. Low, October 19, 1970
21 The Impact of Man and His Environment on the Space Program by George M. Low, October 22, 1970
22 International Aspects of Our Space Program by George M. Low, January 26, 1971
23 Statement of Representative Bob Casey, circa 1970
24 Science and Scientists: Obligations and Opportunities by Philip Handler, President, National Academy of Sciences, October 21, 1970
25 "A Time for Decision" by Edgar M. Cartright, October 28, 1970
26 Aerospace Management - NASA's Major Challenges For the Seventies, 1970
27 Earth Observations Program Review, November 4-5, 1969
28 America in Space - The First Decade - Exploring the Moon and Planets by William R. Corliss, October 1, 1968
29 NASA Facilities Data, October 1974
30 The Apollo Spacecraft - A Chronology - Volume I, 1969
Box Folder
6 1 Space Science and Applications, October 1970
2 Astronomy Programs Review, June 2-3, 1970
3 Communications Programs Review, January 21, 1970
4 NASA Facts - Educational Publication - Mars as a Member of the Solar System, December 1975
5 Memorandum on Study of Aerospace Management Techniques from D. J. Harnett, February 1, 1972 - Attached to Aerospace Management Techniques: Commercial and Governmental Applications by J. Gordon Milliken and Edward J. Morrison, November 1971, 1971-1972
6 Aboard the Space Shuttle Educational Pamphlet, 1980
7 Apollo 14: Science at Fra Mauro by Walter Froehlich, 1971
8 McDonnell Douglas Payload Assist Module (PAM) - Educational Materials in Folder, November 1982
9 Office of Manned Space Flight - Apollo Program - Apollo Configuration Management Manual, May 18, 1964
10 Office of Manned Space Flight - Apollo Program - NASA Apollo Program Management - Volume I, December 1967
11 Note from James C. Fletcher to NASA Employees, August 14, 1986, Attached to Report to the President - Actions to Implement the Recommendation of the Presidential Commission on the Space Shuttle Challenger Accident - Executive Summary, July 14, 1986, August 14, 1986 and July 14, 1986
12 Information on Earth-Moon Transits, circa 1964
13 Aviation Week and Space Technology Magazine, June 20, 1966
Box Folder
7 1 Saturn V Flight Manual - SA 506, February 25, 1969, Changed June 10, 1969, June 10, 1969
2 Mercury Project Summary Including Results of the Fourth Manned Orbital Flight, May 15-16, 1963
3 Missiles and Rockets - The Weekly of Space Systems Engineering Pamphlet, August 13, 1962
4 Fairchild Stratos - Spacecraft Systems Engineering Pamphlet, Highlighting the New Team for Space Development, 1962
5 Letter from T.J. Vincent to ill Sneed Concerning "Fairplan" Manual, October 12, 1962
6 Saturn Illustrated Chronology - Saturn's First Eight Years, April 1957 - April 1965, May 15, 1965
7 Grumman Aircraft Engineering Corporation - Lunar Module Subsystem Assembly and Installations, December 1967
8 Saturn V - Component Qualification Test Program - Status Analysis Monthly Report, March 8, 1966
9 Saturn V Configuration Management Implementation Program for Marshall Space Flight Center, July 27, 1964
10 Note on Distribution of Baseline Configuration Document from Charles N. Crews, January 15, 1987
11 Baseline Configuration Document - Space Station Program Office, January 15, 1987
Box Folder
8 1 Saturn V Master Test Plan, October 20, 1965, June 1, 1966
2 Management Procedures In Computer Programming For Apollo - Interim Report, November 30, 1964
3 Saturn V Program Schedules, Status and Analysis, March 2, 1967
4 Saturn V - Pert Status and Project Trends - Program Control Office, July 8, 966
5 The President's Plan for Space - A Partnership for Progress - Statement for Press Briefing from James M. Beggs, NASA Administrator, January 26, 1984
6 Letter to James "Jim" M. Beggs from The Secretary of Defense, January 16, 1984
7 Defense Daily - Space Station Science Adviser Wants Science Heeded, January 16, 1984
8 NASA News - Space Station Proposals Sought, September 14, 1984
9 NASA News - Four NASA Centers Assigned Space Station Studies, June 28, 1984
10 Data Requirements for the Payload Data Package Annex - Payload Integration Plan Annex No. 1, July 1991
11 Letter to William R. Graham from the House of Representatives Committee on Appropriations, January 14, 1986
12 Soviet Salyut 8 Space Station Diagram, 1986
13 Space Station Program Concerns by Gordon Fullerton, June 20, 1986
14 Management Review of Space Station Program - General Sam Phillips, June 26, 1986
15 Space Station Management: An Analysis of Work Package Options, October 3, 1986
16 Space Station Presentation to Mr. James Beggs Administrator, February 7, 1984
17 Office of Space Station FY 1986 Budget Recommendation Administrator's Review, August 22, 1984
18 Space Station Program Planning Status - Presentation to NASA Policy Review Committee, May 15, 1984
19 Flight Telerobotic Servicer to User Interface Control Document, July 10, 1990
Box Folder
9 1 Proposed Change Request for Collision Avoidance, July 27, 1990
2 Space Station Freedom Robotic Systems Integration Standards, July 15, 1990
3 Space Station Work Package - 3 Prime Contractor Request for Proposal Review, November 4, 1986
4 Group of Materials - Including Photographs and Informational Materials - on Terra, NASA's Earth Observing System, circa 1999
5 Space Station Program History: 1981 - 1987, February 12, 1988
6 Briefing to Dr. James C. Fletcher, Administrator - Summary Results of the Space Station Operations Task Force, May 1, 1987
7 Space Station Reference Configuration - Systems Engineering and Integration Space Station Program Office Cover, August 1984
8 Space Station - The Next Logical Step, circa 1984
9 Practical Applications of Space Systems - Supporting Paper 1 - Weather and Climate, 1975
10 Practical Applications of Space Systems - Supporting Paper 2 - Uses of Communications, 1975
11 Practical Applications of Space Systems - Supporting Paper 3 - Land Use Planning, 1975
12 Practical Applications of Space Systems - Supporting Paper 4 - Agriculture, Forest, and Range, 1975
13 Practical Applications of Space Systems - Supporting Paper 5 - Inland Water Resources, 1975
14 Practical Applications of Space Systems - Supporting Paper 6 - Extractable Resource, 1975
15 Practical Applications of Space Systems - Supporting Paper 7 - Environmental Quality, 1975
Box Folder
10 1 Practical Applications of Space Systems - Supporting Paper 8 - Marine and Maritime Uses, 1975
2 Practical Applications of Space Systems - Supporting Paper 9 - Materials Processing in Space, 1975
3 Practical Applications of Space Systems - Supporting Paper 10 - Institutional Arrangements, 1975
4 Practical Applications of Space Systems - Supporting Paper 11 - Costs and Benefits, 1975
5 Practical Applications of Space Systems - Supporting Paper 12 - Space Transportation, 1975
6 Practical Applications of Space Systems - Supporting Paper 13 - Information Services and Information Processing, 1975
7 Practical Applications of Space Systems - Supporting Paper 14 - Technology, 1975
8 Two Over Mars - Mariner VI and Mariner VII, February - August 1969
9 Federal Research and Development for Satellite Communications, 1977
10 Manual for the Preparation of Project Status Review (PSR) Report and Monthly Status Review (MSR) Report - Revision 1, November 1978
11 Practical Applications of Space Systems, 1975
12 Space Station Program Description Document - Book 1 Introduction and Summary - Prepared By The: Space Station Task Force, March 1984
13 Space Station Program Description Document - Book 2 Mission Description Document - Prepared By The: Space Station Task Force, March 1984
14 Space Station Program Description Document - Book 3 System Requirements and Characteristics - Prepared By The: Space Station Task Force, March 1984
15 Space Station Program Description Document - Book 4 Advanced Development Program - Prepared By The: Space Station Task Force, March 1984
16 Space Station Program Description Document - Book 6 System Operations - Prepared By The: Space Station Task Force, March 1984
17 Four Overhead Projector Slides - Diagrams, circa 1985?
18 Note from Martin Sedlazek Concerning and Attached to Document of Comments on Level A Program Requirements Documents, August 30, 1984
19 Advance Copy of Interim Baseline Decisions, August 17, 1989
20 Space Station Program - Program Requirements Document, April 5, 1984 - Attached to Note Concerning Its Distribution from Philip E. Culbertson, June 25, 1984, April 5, 1984 and June 25, 1984
Box Folder
11 1 Space Station Program - Program Requirements Document, April 5, 1984 - Attached to Note on Its Distribution from John D. Hodge, April 6, 1984, April 5 - 6, 1984
2 Space Station Program Requirements Document, August 15, 1984, Attached to Note on Distribution of Document, August 15, 1984, August 15, 1984
3 Rephased Program Capability (RPC) Utilization Assessment, September 6, 1989
4 Initial OSSA Reactions to the Space Station Rephasing, September 19, 1989
5 Space Station Freedom External Maintenance, July 20, 1990
6 Flight Telerobotic Servicer (FTS) - Configuration/Performance Requirements, circa 1985?
7 FTS - Flight Telerobotic Servicer - Expanding U.S. Robotic Technologies Informational Report , circa 1990
8 Space Station Program Systems Engineering and Integration - RUR-2 Results and Summary, November 1985
9 Level A/B Program Review - Space Station Development Program Cost Estimate, August 23, 1984
10 Space Station FY 1985 Budget Hearing - Space Science and Applications Subcommittee - U.S. House of Representatives - Backup Data, February 2, 1984
11 Space Station Presentation to the NASA Advisory Council, July 18, 1984
12 Polar Orbiting Platform System Concept Review, March 15, 1989
13 User Accommodation Assessment "SRR Results", May 5, 1986
14 Critical Evaluation Task Force Impacts - Presented to SSCB, October 3, 1986
15 Critical Evaluation Task Force - Report to the NASA Executive Technical Committee, September 8, 1986
16 Space Station Program Description Document - Book 1 Introduction and Summary - 1st Edition, December 13, 1982
17 Space Station Program Description Document - Space Station System Requirements Document - Prepared By The: Space Station Task Force Concept Development Group, December 25, 1983
Box Folder
12 1 Space Station Review to Mr. Culbertson - Associate Deputy Administrator, December 1983 - January 1984
2 Advancing Automation and Robotics Technology for the Space Station and for the U.S. Economy - A Technical Report, Volume II, March 1985
3 Advancing Automation and Robotics Technology for the Space Station and for the U.S. Economy - Executive Overview - Volume I, March 1985
4 Space Station Program Description Document with Books 1-7 Titles - Final Edition Cover, March 1984
5 Space Station Program Description Document - Book 7 Program Plan - Prepared By The: Space Station Task Force - Final Edition, March 1984
6 Distribution Note from Lyn D. Wigbels, June 27, 1985, Concerning and Attached to Research on Multinational Enterprises Experience Relevant to International Partnerships for Space Station - Summary Report, August 1984 - January 1985, August 1984 - January 1985, June 27, 1985
7 Draft Final - Summary Report of the Space Station Operation Task Force, August 28, 1987
8 The Planetary Report Magazine - Volume X, Number 3, May/June, 1990
9 Design Guidelines for Robotic Serviceable Instruments - Preliminary Guidelines Document, August 1989
Box Folder
13 1 Saturn V Flight Manual - SA 509, August 15, 1969, Changed January 1, 1971, January 1, 1971
2 Current News - Apollo 11 Special - Part 1, July - August, 1969
3 Space Station Reference Configuration - Systems Engineering and Integration Space Station Program Office - Pages 1 - 400, August 1984
4 Space Station Reference Configuration - Systems Engineering and Integration Space Station Program Office - Pages 401 - 786, August 1984
5 Station Keeping Platform - Feasibility Study - Final Report, June 19, 1987
6 Utilization of Space Station Freedom (SSF) Platform Hardware to Support Initial SSF Assembly, March 1, 1989
Box Folder
14 1 Code E Space Station Pointer System Study - Study Team Final Report, January 1988
2 Space Station, December 4, 1986
3 Space Station Freedom Program - Goddard Space Flight Center - Associate Administrator's Review by James Moore, February 28, 1991
4 Space Station Management Plan and Procurement Strategy, December 14, 1984
5 Folder Containing Photographs and Information on Mariner Mars 1969, December 15, 1969
6 Ranger 1964-65 Informational Report, July 1964
7 Building Blocks to Space Informational Report, circa 1972
8 Aerospace Management Quarterly, Summer 1966, Volume 1, Number 2, 1966
9 Propulsion For Deep Space Informational Report, June 1966
10 Report from Mars - Mariner IV - Two Copies, 1964 - 1965
11 National Geographic Magazine - Featuring "Voyage to the Planets" Article, August 1970
12 Testimony to the U.S. Senate - Committee on Aeronautical and Space Sciences - "The Pioneering Phase of our Expansion into Space" by Harrison H. Schmitt, Tuesday, April 10, 1973, April 10, 1973
13 Statement of Willis H. Shapley Associate Deputy Administrator - National Aeronautics and Space Administration before the Subcommittee on Africa - Committee on Foreign Affairs - House of Representatives, circa 1970
14 NASA Photograph - Earth from Space?, circa 1970
15 NASA Photograph - Group of Men with Respective Signatures Below - Eleven Copies, circa 1965
16 Project Gemini - A Chronology, 1969
17 Microgravity - Informational Report, circa 1985?
18 Flight Telerobotic Servicer (FTS) In-House Phase B Study Results, April 29, 1988
Box Folder
15 1 Flight Telerobotic Service - In-House Phase B Study - First NASA/Industry Briefing - Goddard Space Flight Center, December 14-15, 1987
2 Managing NASA in the Apollo Era, 1982
3 Aviation Week and Space Technology Magazine - "Commercialization of Space", June 25, 1984
4 NASA Memoranda and Agreements Regarding the Space Station, 1988
5 Space Station - Phase C/D/E Agreements, December 1988
6 Distribution Note on MOU Reference Package , January 4, 1989
7 Memorandum of Understanding Between the United States National Aeronautics and Space Administration and the European Space Agency on Cooperation in the Detailed Design, Development, Operation and Utilization of the Permanently Manned Civil Space Station with Memoranda Attached, 1988
8 Memorandum of Understanding Between the United States National Aeronautics and Space Administration and the European Space Agency on Cooperation in the Detailed Design, Development, Operation and Utilization of the Permanently Manned Civil Space Station with Memoranda Attached, 1988
9 Attachment 2 - Amendment of Article 12 of the NASA/STA MOU, 1988
10 Lessons for the Space Station: JPL's Perspective on the Shuttle Payload Process, March 1, 1987
Box Folder
16 1 NASA Space Station Freedom User Utilization Project Office - SSF Payload Integration Group White Paper - Final Draft Report, December 1990
2 Preliminary Launch Site Processing Assessment - Space Station Flight Telerobotic Servicer (SSFTS), June 22, 1990
3 KSC MB-1 Processing Flow - GSFC/KSC Bilateral Meeting, June 22, 1990
4 FTS/APAE Memoranda and Information, July 11, 1990
5 FTS/APAE Information and Diagram, July 11, 1990
6 Flight Telerobotic Servicer to Space Station Freedom Interface Control Document - Preliminary, June 1, 1990
7 Flight Telerobotic Servicer to Mobile Servicing Centre Interface Control Document - Preliminary, June 1, 1990
8 MIR - FTS Interview, April 19, 1990
9 Space Station Attached Payload Pointing System Options Study - Pointing System Design Concept and Performance Analysis White Paper, June 15, 1989 - Includes Letter on Report from Robert L. Staehle to Dr. Phillip Cressy, August 14, 1989, June 15, 1989, August 14, 1989
10 Flight Telerobotic Servicer (FTS) Monthly Status Review, July 20, 1990
11 Space Station: Leadership for the Future by Franklin D. Martin and Terence T. Finn, 1987
12 Space Station: A Research Laboratory in Space, circa 1990
13 Space Station/Space Station - Attached Payload Pointing Accommodation Study - White Papers, February 1988
14 NASDA (National Space Development Agency of Japan) Informational Report, circa 1990
Box Folder
17 1 Delta - 1960 - 1980 - America's Busiest and Most Versatile Launch Vehicle, circa 1980
2 Studying the Earth from Space Pamphlet , 1972
3 Committee Print - The National Space Program - Present and Future - A Compilation of Papers Prepared for the Subcommittee on NASA Oversight of the Committee on Science and Astronautics U.S. House of Representatives - Ninety-First Congress - Second Session - Serial U, December 10, 1970
4 NASA 1958-1983 - Remembered Images, circa 1984
5 National Aeronautics and Space Act of 1958, As Amended and Related Legislation, July 1, 1969
6 Committee Print - Astronauts and Cosmonauts Biographical and Statistical Data - Report Prepared for the Committee on Science and Technology U.S. House of Representatives Ninety-Fourth Congress - First Session By The Science Policy Research Division Congressional Research Service - Library of Congress - Serial E, June 1975
7 Committee Print - Apollo Program Management - Staff Study for the Subcommittee on NASA Oversight of the Committee on Science and Astronautics U.S. House of Representatives - Ninety-First Congress - First Session - Serial C, July 1969
8 Vanguard - A History by Constance McLaughlin Green and Milton Lomask, 1970
9 Apollo 15 - Preliminary Science Report, 1972
10 NASA Facts - Space Shuttle Fold Out Informational Poster, 1972
11 IEEE Spectrum Magazine - Special Issue - Communications: onward to the 80s, October 1979
Box Folder
18 1 Review and Assessment of the U.S. Space Program by Homer E. Newell, May 1971
2 Speech by Dr. James C. Fletcher Administrator National Aeronautics on Space Administration to the Twenty-fifth Annual Conference Aerospace Industries Association, Williamsburg, VA. , May 20, 1971
3 Post Launch SL-1/SL-2 - Skylab Mission Operation Report, 1973
4 Space Flight Record - 1958-1970, December 31, 1970
5 Early Private Ventures - McDonnell Douglas Astronautics Company, October 1982
6 A Cost History of the Thor-Delta Launch Vehicle Family by E.W. Bonnett, September 1974
7 Skylab Experiments - Volume 2 - Remote Sensing of Earth Resources - Educational Reports, May 1973
8 Skylab Experiments - Volume 3 - Materials Science - Educational Report, May 1973
9 Skylab Experiments - Volume 4 - Life Sciences - Educational Report, May 1973
10 The Space Applications Program , 1974
11 Skylab Earth Resources Data Catalog, 1974
12 Future NASA Space Programs - Hearing Before The Committee on Aeronautical and Space Sciences United States Senate - Ninety-First Congress - First Session, August 5, 1969
13 The Space Program in the Post-Apollo Period - A Report of the President's Science Advisory Committee, February 1967
Box Folder
19 1 An Administrative History of NASA - 1958-1963, 1966
2 Committee Print - Space Law- - Selected Basic Documents - Staff Report Prepared For the Use of the Committee on Aeronautical and Space Sciences - United States Senate, December 30, 1976
3 Committee on Aeronautical and Space Sciences - United States Senate - Tenth Anniversary, 1958-1968, 1968
4 Report of the Central Review Committee - Useful Applications of Earth - Oriented Satellites, 1969
5 Priorities For Space Research - 1971-1980, 1971
6 Skylab - A Guidebook, circa 1970
7 OLS Project - Thanks for the Memories Informational Pamphlet - 1958-1998, circa 1998
8 Memorandum Concerning and Attached to Science and Our Future - Address by Homer E. Newell - Associate Administrator - NASA, December 30, 1970
9 Letter from Howard J. Lewis to Dr. George M. Low Concerning Discussion of Science Policy, January 5, 1971
10 Management Scheme for Apollo, circa 1965
11 What the Space Program Has Told Us About the Moon by Homer E. Newell, February 12, 1971
12 The Next Fifty Years Pamphlet by Dr. Hugh L. Dryden, July 1953
13 India Magazine Article, September, 1970
14 Comparisons - First Wright Flight and Apollo II - Saturn 5 Flight, circa 1969
15 Apollo Program - Interesting Information - Saturn V, circa 1969
16 Apollo Briefs, circa 1965
Box Folder
20 1 Man in Space - The Management Challenge, circa 1969
2 Spacecraft Information and Diagrams , circa 1969
3 Apollo Program - Interesting Information - Lunar Module, Apollo Spacecraft General, Command and Service Module, General, Space Program General, circa 1969
4 Typed Page on NASA's Use of Computers, circa 1969
5 Symposium on Significant Results Obtained From Earth Resources Technology Satellite-1 - Volume II - Summary of Results, March 5-9, 1973, May 1973
6 Earth Observations From Space - Binder, March 1973
7 Delta - A Legacy of Successful Adaptation, September 14-15, 1983
8 In Folder - Satellite System Documents, 1983
9 In Folder - Includes Documents on Tracking and Data Relay Satellite System (TDRSS), 1983
10 Putting Space to Work - Annual Report of the NASA Office of Applications, 1976
11 Report to the Congress - A Metric America - A decision whose time has come, July 1971
12 "In This Decade..." - Mission to the Moon Booklet, circa 1969
13 Hughes Multispectral Scanner System For Erts - Goddard Space Flight Center, circa 1972
14 What's New on the Moon? Booklet, 1976
15 Five Year Plan - Office of Applications - Presentation: August 15, 1973, August 15, 1973
16 Space Shuttle Report, 1976
Return to the Table of Contents